Justifying the project is the first, and perhaps the most important stage. It involves assessing whether the project is worth pursuing and whether it is likely to be deliverable. Because of the importance of these issues, it can be beneficial to seek expert advice, perhaps from a surveyor or an architect with experience of self-build homes.
Prepare a statement of need
A ‘statement of need’ is a first attempt to set down on paper the requirements that could justify the project. It should also list alternative solutions, such as; purchasing a completed building, extending or refurbishing an existing building, doing nothing and so on.
Assess the viability of the project
It is then necessary to explore the options set out in the statement of need in more detail. This might include assessment of:
- The likelihood of obtaining a suitable plot.
- The likelihood of obtaining planning permission.
- The likely order of cost of the project (including fees, taxes, contingency, inflation, fixtures and fittings and so on).
- The availability of funds.
- The likely delivery route (see Develop a delivery strategy for more information).
- The likely length of the project programme.
- Alternative accommodation arrangements during construction (if necessary).
- An assessment of project risks.
- Assessment of comparable completed projects.
- An assessment of the amount of time that can be dedicated to the project.
- The strategy for managing the project.
- An assessment of the assistance that might be required.
- A preliminary organisational structure for the project.
- The likely value of the finished home.
The project should only proceed to the next stage if this assessment suggests the project is viable, desirable, achievable and affordable.
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.